Client: University of witswatersrand (WITS)
Kgobisa Projects has effectively executed a transformative project involving the upgrading and refurbishment of the 2nd floor of the Senate House for the new Transnet Matlafatso Centre. This endeavor encompassed essential components, resulting in a rejuvenated space that meets contemporary standards for functionality, comfort, and energy efficiency. The following aspects highlight the successful completion of this project:
Building Works:
- The 2nd floor of the Senate House underwent substantial building works to enhance structural integrity, durability, and aesthetic appeal.
- Architectural enhancements were carefully implemented, contributing to an improved and modernized overall design.
HVAC Installations:
- The installation of state-of-the-art heating, ventilation, and air conditioning (HVAC) systems has been successfully completed.
- Modern HVAC equipment, along with efficient ductwork and temperature control mechanisms, now ensures a comfortable and climate-controlled environment on the 2nd floor.
